La bibliothèque numérique kurde (BNK)
Retour au resultats
Imprimer cette page

The Ilisu Dam


Auteur : Kerim Yıldız
Éditeur : Kurdish Human Rights Project Date & Lieu : 1999-01-01, London
Préface : Pages : 156
Traduction : ISBN : 1 -900175-29-0
Langue : AnglaisFormat : 210x295mm
Code FIKP : Br. Eng. Yil. Ili 688Thème : Général

Présentation Table des Matières Introduction Identité PDF
The Ilisu Dam


Kurdish Human Rights Project: The Ilisu Dam

Kerim Yildiz

KHRP

The Ilisu hydro-electric power project is part of Turkey's Southeastern Anatolia Project (GAP). The site is situated on the Tigris river, about 65 km upstream of the Syrian and Iraqi border. With a planned capacity of 1,200 MW, Ilisu is Turkey's largest pending hydropower project.
In September 1999, a fact finding team comprising three lawyers and a specialist in the social and environmental impacts of large dams visited Diyarbakir, Batman and Hasankeyf in south east Turkey on behalf of the Kurdish Human Rights Project. The purpose of the mission was to make site visits and to confer with elected officials, members of local organisations and those likely to be affected by the dam. Despite constant police surveillance and control, which severely restricted the delegation’s ability to conduct independent investigations as originally intended , recorded interviews were conducted with local politicians, lawyers, historians and a small number of project affected residents.
The mission also attended a public conference ...



Fondation-Institut kurde de Paris © 2024
BIBLIOTHEQUE
Informations pratiques
Informations légales
PROJET
Historique
Partenaires
LISTE
Thèmes
Auteurs
Éditeurs
Langues
Revues